Provide sanitary conditions and controls for cleaning and isolation of drinking water tanks where washing and disinfection of drinking water tanks should be considered to prevent diseases caused by contaminated water and to maintain public health.
Some types of insulation cannot be tested, such as:
1- Isolation of foundations.
2 - Isolation of basements surrounded by buildings.
Therefore, care must be taken in the selection of materials and the type of insulation and care supervision of the implementation.
Professionalism is the title of work within the company and the main reliance on superior quality in the processes of isolation of customer افضل شركة تنظيف بيارات بالرياض cabinets in Riyadh We are a tank insulation company
We seek to provide the best tanks insulation services in Riyadh
We have developed reservoir insulation services in Riyadh. Our company is a reservoir insulation company in Riyadh always strives for innovation and strong performance
General conditions and precautions to be taken into account in the implementation of insulation work:
The drawings and project documents should be read well before starting the insulation work.
Take into account that the surface to be isolated shall be a flat surface free of ripples, flicks, disjointed parts, completely dry and moisture free.
Ensure that insulated surfaces are clean before starting the insulation process by:
• Remove dust and impurities.
• Remove the mortar.
• Remove traces of oil and grease.
• Iron rust removal in case of metal surfaces.
• Aramis filled the buildings in the places to be insulated so that these impurities do not affect the adhesion strength between the insulation layer and the original surface to be isolated, which may lead to water leakage under the insulation layers.
Remove the loose parts and nesting of concrete surfaces / buildings to be isolated .. And then leveled with cement mortar until the insulation is implemented on strong surfaces hard so as not to collapse the insulation layer.
Isolate concrete structures / buildings .. whose level is located below the level of the ground on concrete or buildings immediately شركة كشف تسربات المياه بالرياض after the payment of Aramis.
Treatment of cracks, nesting, casting joints, places of riders and all defects surfaces before the implementation of insulation.
Treatment of the points of the interviews of vertical and horizontal surfaces because these points are one of the points of weakness of insulation that can leak water from it and the treatment is as follows:
• Wrap the interviews by the work of a triangle overalls with dimensions of about 80: 100 mm of suitable cement mortar.
• Fasten the confluence of rendering of vertical surfaces with horizontal well.
Test suitable materials for insulation to suit the conditions of origin and the type of water or liquids exposed to insulation.
The protection of the waterproofing layers shall be protected from the weather by providing a protective layer:
• In the case of surfaces: the insulation layer is protected by a plaster over it to protect it from ultraviolet rays that reduce its shelf life.
• In case of wall insulation: the insulation layer is protected .. either by building a wall 2/1 brick in the case of external insulation or concrete wall.
The materials used in insulation shall be of the highest quality and conform to the technical specifications mentioned in the project documents.
Samples of different insulation materials shall be شركة نظافة خزانات بالرياض submitted for approval by the consultant or owner prior to delivery.
Consider the supply of various materials to the site of the process / project in sufficient quantities necessary to carry out the required work at each stage of the work according to the executive program and in quantities that allow for continuous implementation without disrupting the implementation of other work.
Store the necessary materials in a way that prevents them from being damaged and identified to the weather. Storing the rolls of insulation cloth inside a dry store with continuous ventilation and not exposed to direct sunlight.
For bitumen .. It is supplied in its original packaging and indicated by the type of bitumen and the name of the manufacturer of the company .. The stacking and storage of containers in the proper way and includes not being damaged by the method of storage or exposure to weather factors.
At Al-Bait Al-Raqi Company, we offer tanks insulation services in Riyadh with innovative knowledge through creative engineers who seek to implement the work with full professionalism.
Implementation conditions for insulation under ground water level:
In the implementation of the water and moisture insulation layer of parts of the building located under the basement water level take into account:
Drilling sides shall be at least 30 cm to 60 cm from the wall buildings supporting these parts so that the buildings are as dry as possible for the duration of the work. Also according to the type of material used.
Take into account that the floor (concrete slab) of this building, which will be insulating layer with a level surface free of ripples and mortise and parts
Disassembled and completely dehydrated.
Vertical exterior walls shall be constructed at full height and the structural thickness on which the insulating layers will be applied. Aramis buildings shall be filled to the exterior well with cement mortar and emptying the building arames to the internal surfaces at a depth of 5 mm before the implementation of the cement white layer.
The excavation surrounding the walls of the building shall be kept clean and dry for the duration of the implementation of all insulation and construction works.
Once the insulating layer is finished on the floor and the vertical walls around it, a plaster or wall is made to prevent damage.
It is necessary to keep the site surrounding the buildings in a completely dry state during the period of the implementation of insulating layers and construction works under the level of the site floor. That are approved by the consultant before performing these water works down the insulating layers.
Remove loose parts and nesting from concrete surfaces / buildings to be insulated. They are then leveled with cement mortar until the insulation is carried out on strong hardened surfaces so that the insulation layer does not collapse.
Isolate concrete structures / buildings .. whose level is located below the level of the ground on the concrete or building